Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Self Extracting File Format
    • Immediate download
    • $52.00
    • Add to Cart
 

About This Item

 

Full Description

This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.

Facility owners and operators require tools to aid in capital improvement planning. They often turn to engineers, program managers, contractors, and specialized FCA providers to perform a Facility Condition Assessment that gathers their deferred maintenance deficiency and backlog lists. But is this data the same quality? Does it lead to projects that consider the changing needs of the owner? And does an FCA accurately capture costs in a challenging economic environment? These industry leading professionals offer case studies that highlight the ways an FCA is used to address the planning needs to benefit the asset’s operation, maintenance and cost management.

  1. Is Your FCA Ready with Quality Data? FCA Beyond the Industry Standard< /br> Catherine Tinkler, EBCP, PMP, LEED AP O+M, Page Southerland Page, Inc., Weston Lakes, TX
  2. Is Your FCA Ready for Any Future? FCA That Can Survive the Chaos< /br> David Handwork, Pe, United Commercial Energy Partners, Frisco, TX
  3. Is Your FCA Ready for This Economy? FCA Projects That Get Funded< /br> Mark Schrock, FOS of CannonDesign, LLC, Buffalo, NY; and Brett Garrett, The Ohio State University, Columbus, OH