Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Building owners will often retain a criterion engineer (CE) to establish the initial design criteria for a project. The CE will create documents that will be handed off to the design build contractor. After this, the role of the CE can vary. The direction of the project can be very dependent on the CE involvement after bridging documents are completed. This seminar discusses the issues that can arise as the owner and design build contractor interpret the bridging documents and how open or closed a line of communication is with the CE during all phases of a design build project.

Criterion Engineer's Role in a Design Build Project
Phillip M. Trafton
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)

Who Holds the Risk: The Criterion Engineer, the Design Build Contractor or the Design Build Engineer?
John Kuempel, P.E., Member
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)

How Can the Design/Build Engineer Effectively Work with the Criterion Engineer on a Design/Build Project?
Jessica Mangler, P.E., Member
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)

Run Time: 90 mins.