Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

Outlines how the revised ASHRAE Guideline for Commissioning of HVAC Systems can be used to reduce, if not avoid, claims arising out of the design, installation and start-up of HVAC systems. Uses recently concluded litigation involving a HVAC system as a case study to provide concrete examples of how the guideline could have eliminated mistakes made by all participants in the construction process.

KEYWORDS: USA, legal practice, case studies, buildings, commissioning, regulations, heating, ventilation, air conditioning, designing, installing, starting