Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $108.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This guide provides installation methods to improve cable installation practices in generating stations. Some specific limits in cable installation are covered in IEEE Std 422-19861 and IEEE Std 690-1984 and are not within the scope of this guide. This guide may also be of benefit to cable pulling crews in commercial and industrial facilities when similar cable types and raceways are used.

Purpose

The purpose of this guide is to improve cable pulling practices in generating stations by: a) Establishing alternative methods of limiting and monitoring cable pulling tensions to prevent cable damage from excessive pulling tension b) Introducing the use of cable pull charts that address cable pulling limits including sidewall bearing pressure, and relationship of conduit length and total conduit bends c) Establishing safe guidelines for pulling cables into conduits containing cables (pullbys) d) Providing practical guidance in lubrication techniques, pull rope attachment methods, and pull rope selection e) Facilitating good conduit system layout to permit the safe installation of cables in most raceways without the need for difficult monitoring or costly, rigorous calculations

Abstract

New IEEE Standard - Superseded. Installation methods to improve cable installation practices in generating stations are provided. These include cable lubrication methods, conduit-cable pulling charts, pull rope selection criteria, pulling attachment methods, and alternative methods to traditional cable pulling tension monitoring. This guide supplements IEEE Std 422-1986 and IEEE Std 690-1984, which provide specific cable installation limits. This guide may also be of benefit to cable pulling crews in commercial and industrial facilities when similar cable types and raceways are used.
 

Document History

  1. IEEE 1185-2019


    IEEE Recommended Practice for Cable Installation in Generating Stations and Industrial Facilities

    • Most Recent
  2. IEEE 1185-2010


    IEEE Recommended Practice for Cable Installation in Generating Stations and Industrial Facilities

    • Historical Version
  3. IEEE 1185-1994

    👀 currently
    viewing


    IEEE Guide for Installation Methods for Generating Station Cables

    • Historical Version