Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $182.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $261.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This part of IEC 61557 specifies the requirements applicable to measuring equipment for testing the phase sequence in three-phase distribution systems. Indication of the phase sequence can be mechanical, visual and/or audible.

This document does not apply to additional measurements for other quantities. It does not apply to monitoring relays.

NOTE Common  three-phase distribution systems are depicted in IEC 610101: 2010, Annex I and
IEC 61010-1:2010/AMD1:2016, Annex I.

 

Document History

  1. IEC 61557-7 Ed. 3.1 b:2023

    👀 currently
    viewing


    Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence CONSOLIDATED EDITION

    • Most Recent
  2. IEC 61557-7 Ed. 3.0 b:2019


    Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

    • Historical Version
  3. IEC 61557-7 Ed. 2.0 b:2007


    Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

    • Historical Version
  4. IEC 61557-7 Ed. 1.0 b:1997


    Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

    • Historical Version