This slide presentation outlines information on Phoenix, Arizona's Union Hills WTP 160 MGD Improvements Project. The project was done in three phases: Phase 1 involved rebuilding the existing 32 filters and constructing 4 new 5 MGD filters; Phase 2 involved a raw water impoundment split; Phase 3a involved pretreatment facilities and Phase 3b involved an interim dewatering building. Further topics covered include: design criteria for residuals handling; high turbidity events; comparing operational parameters; residuals parameters during high turbidity events; raw and settled tubidities; average turbidity and production; total organic carbon removals; centrifuge dewatering parameters during high turbidity events; residuals parameters during high turbidity events; and, residuals contingency plans.