1.1 This practice covers common installation requirements for temporary silt fence applications. This practice is based on AASHTO M288.

1.2 This practice is applicable to the use of silt fence as a vertical permeable interceptor designed to remove suspended soil from overland, nonconcentrated water flow. The function of a temporary silt fence is to trap and allow settlement of soil particles from sediment laden water. The purpose is to greatly limit the transport of eroded soil from the a construction site by water runoff.

1.3 The practices presented herein are intended to ensure good workmanship and quality and are not necessarily adequate for all purposes in view of the wide variety of possible sediments and performance objectives.

1.4 The values stated in SI units are to be regarded as the standard. The values in inch-pound units are provided for information only.

1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

 

Document History

  1. ASTM D6462-19


    Standard Practice for Silt Fence Installation and Maintenance

    • Most Recent
  2. ASTM D6462-03(2008)


    Standard Practice for Silt Fence Installation (Withdrawn 2017)

    • Historical Version
  3. ASTM D6462-03


    Standard Practice for Silt Fence Installation

    • Historical Version
  4. ASTM D6462-99

    👀 currently
    viewing


    Standard Practice for Silt Fence Installation

    • Historical Version