Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $57.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $77.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

1.1 The purpose of this guide is to assist practitioners in the development, selection, design, and implementation of interim, short-term, or early action remedies undertaken at sites of waste contamination for the purpose of managing, controlling, or reducing risk posed by environmental site contamination. Early action remedies and strategies are applicable to the management of other regulatory processes (for example, state underground storage tank (UST) programs are equally applicable) in addition to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)/National Oil and Hazardous Substances Pollution Contigency Plan (NCP) process. This guide identifies and describes a standard process, technical requirements, information needs, benefits, and strategy for early actions.
1.2 This guide is applicable to both nonhazardous and hazardous sites of contamination as defined by CERCLA as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) and the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA) of 1986.
1.3 To the extent that this guide may be used for hazardous materials operations, it does not address the applicability of regulatory limitations and local requirements.
1.4 This guide offers an organized collection of information or a series of options and does not recommend a specific course of action. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this guide may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project''s many unique aspects. The word "Standard" in the title of this document means only that the document has been approved through the ASTM consensus process.
1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
 

Document History

  1. ASTM D5745-23

    👀 currently
    viewing


    Standard Guide for Developing and Implementing Interim and Early Actions for Waste Contamination Site Remediation

    • Most Recent
  2. ASTM D5745-15


    Standard Guide for Developing and Implementing Short-Term Measures or Early Actions for Site Remediation

    • Historical Version
  3. ASTM D5745-09


    Standard Guide for Developing and Implementing Short-Term Measures or Early Actions for Site Remediation

    • Historical Version
  4. ASTM D5745-95(2005)


    Standard Guide for Developing and Implementing Short-Term Measures or Early Actions for Site Remediation

    • Historical Version
  5. ASTM D5745-95(1999)


    Standard Guide for Developing and Implementing Short-Term Measures or Early Actions for Site Remediation

    • Historical Version