Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $50.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $50.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $65.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

The scope of BPVC Section III, Division 5 covers high temperature gas-cooled reactors, liquid metal reactors and molten salt reactors. Although the primary focus of this document will be on the design and related material considerations for Class A elevated temperature metallic components, the other aspects of BPVC Section III, Division 5 for metallic components will also be briefly addressed.