Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $78.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $101.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This standard applies where concentrated surface flow, non-concentrated surface flow, or shallow subsurface flow is a problem, can be intercepted by a shallow channel and a suitable outlet exists. Soil and site conditions must be suitable to build earth channels and earth ridges and sediment accumulations must be manageable.
 

Document History

  1. ASAE/ASABE EP492.1 (R2023)

    👀 currently
    viewing


    Planning, Design and Construction of Diversions

    • Most Recent
  2. ASAE/ASABE EP492


    Planning, Design and Construction of Diversions

    • Historical Version