Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $52.38
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Sets out the requirements for the installation and maintenance in buildings of stationary batteries having a stored capacity exceeding 1 kW.h, o r a floating voltage of 115 V but not exceeding 650 V. Applies to both b attery rooms and battery cabinets. Safety requirements are included part icularly in relation to the ventilation requirements to ensure an explos ive atmosphere does not arise. Commissioning, inspection and maintenance of stationary batteries are also covered.
 

Document History

  1. AS 2676.1:2020


    Installation, maintenance, testing and replacement of secondary batteries in buildings, Part 1: Vented cells

    • Most Recent
  2. AS 2676.1-1992


    Guide to the installation, maintenance, testing and replacement of secondary batteries in buildings - Vented cells

    • Historical Version
  3. AS 2676.1-1990


    Guide to the installation, maintenance, testing and replacement of secondary batteries in or on buildings - Vented cells

    • Historical Version
  4. AS 2676-1983

    👀 currently
    viewing


    Installation and maintenance of batteries in buildings

    • Historical Version