Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF

      Secure PDF Files

      Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.

        What you can do with a Secure PDF:
      • Print
      • Search
      • Highlight
      • Bookmark
      Please note that some publishers - including BOMA, IADC and ICML - do not allow printing of their documents.

    • 👥
    • Immediate download
    • $110.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $110.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $186.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This document addresses the avoidance of blockages in subsea production control and chemical injection systems (CISs). It includes requirements and gives recommendations for the design and operation of subsea production systems (SPSs) with the aim of preventing blockages in control and production chemical fluid (PCF) conduits and associated connectors/fittings.

In the context of design, this covers not only installed subsea hardware (trees, manifolds, etc.), the connecting linkages (jumper arrangements, umbilical systems, etc.), but the fluids to be conveyed, initially from the fluid manufacturers' facilities through to bunkering at the host facility and, ultimately, injection or usage at remote subsea locations.

The guidelines set out the framework within which more detailed specifications and procedures should be developed to address the particular features of specific projects and specific installations in respect of design through to production operations and, ultimately, decommissioning. They also indicate what needs to be taken into account and approaches that can be considered, or may be taken, in order that blockages do not occur during the installation, commissioning and operations of a SPS.

While the aim of this document is to prevent blockages in a SPS, it also addresses the issues of topside equipment which provides the control and chemical injection (CI) services necessary for the operation and performance of a SPS.