-
- Available Formats
- Options
- Availability
- Priced From ( in USD )
-
- Immediate download
- $15.00
- Add to Cart
Customers Who Bought This Also Bought
-
4332 (RP-962) -- Automated Generation of Hourly Design Se...
Priced From $15.00 -
4363 -- Pressure Drops in T-Junctions-A Comparison
Priced From $15.00 -
4341 (RP-993) -- Improved Fluids for Naturally Stratified...
Priced From $15.00 -
4337 (RP-945) -- Evaluation of Design Ventilation Require...
Priced From $15.00
About This Item
Full Description
Environmental issues were seriously addressed when a new building was designed with district heating and cooling for the Osaka gas company. As a result, the building was officially recognized as "Environmentally Conscious Building No. 1" by the Construction Ministry. In order to reduce cost by peak shaving, adoption of a floor thermal storage system was planned. This paper describes results regarding the peak shaving by floor thermal storage system in designing the air-conditioning system.
Units: Dual