Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $179.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

1. Scope

1.1 This guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a project specific basis when removing coatings that contain lead. The selection of the containment and monitoring strategies is based on an assessment of the type of paint removal method that will be used and the potential impact of the operations on the public, other workers in the area, and the environment. Note that local and state codes and regulations must be reviewed and take precedence to any guidance provided in this document.

The guidance provided in this document also applies to coatings containing other hazardous metals such as cadmium and chromium; however, the recommended analytical monitoring is often based on an analysis for lead. Paint chip sampling and testing for lead and other hazardous metals should be undertaken to properly characterize the paint being removed.

1.2 This guide does not cover the selection of paint removal methods, or design of containment/ventilation systems.
 

Document History

  1. SSPC Guide 18


    Specifier’s Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead Paint Removal Projects

    • Most Recent
  2. SSPC Guide 18

    👀 currently
    viewing


    Specifier's Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead-Paint Removal Projects, Includes Editorial Revision (2015)

    • Historical Version