Language:
-
-
Available Formats
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
- $82.80
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $82.80
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $107.64
- Add to Cart
Customers Who Bought This Also Bought
-
NS-ISO 21503:2022
Priced From $67.30 -
SN-ISO/TR 31004:2013
Priced From $82.80 -
NS 5830:2012
Priced From $48.10 -
NS-EN ISO 56005:2021
Priced From $82.80
About This Item
Full Description
ADOPTED_FROM:CWA 15740:2008
The objective of this CEN Workshop Agreement document is to present a set of transparent and accurate framework for applying / implementing risk-based inspection and maintenance (RBIM) and risk-based life management (RBLM) in industrial organizations
The document formulates the procedure for risk based approach, thereby supporting optimization of operations and maintenance (O&M) as well as asset management.
The purpose of RBIM is to ensure that clearly defined and accepted levels of risk related to:
- safety,
- health,
- environment and
- business/production/operation
are achieved using resource-efficient methods of inspection and maintenance. The methodology for RBIM described here is based on that developed in the European project RIMAP (Risk-based Inspection and Maintenance Procedures for European Industry) [11]. Within the RIMAP project, the RBIM methodology has been developed and validated for chemical, petrochemical, power and steel industries in Application Workbooks [20], [21], but the methodology as such is intended to be industry independent. The methodology addresses the following aspects:
- Inspection and maintenance
- All types of equipment, e.g. pressure containing, rotating, electrical, instruments and safety devices
- Technical and managerial aspects of maintenance and inspection planning
- Asset management related to inspection, maintenance and life assessment for plants, systems and components
- Production and operation.
Although RBIM encompasses RBI & RCM, this document focuses primarily onto RBI. The RCM is included only up to the extent to demonstrate the applicability in the overall context of RBIM.