Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.

Do the improvements and retrofits that we make to building controls actually persist over time? This seminar explores that question for a number of different scenarios including retrocommissioning, new building commissioning and general retrofit of building automation. Results from primary research on the subject are presented as well as first-hand accounts from controls and commissioning contractors in the field. The session also demonstrates methods for improving persistence, including longer term activities like monitoring.
1. Key Steps to Improving Persistence of Commissioning
Jeff Stein, P.E., Member, Taylor Engineering, Alameda, CA
2. Observations and Results from a Field Study of Retrocommissioning Persistence
Xiaohui Zhou, Ph.D., Member, Seventhwave, Madison, WI
3. Stories from the Field: Working with Facility Managers Toward Persistent Improvements
Jason Jones, Member, Aerobuild, Chicago, IL
4. Persistence of Savings Isn’t a Side Issue: Using New Tech to Make Sure Savings Show Up at the Meter
Jim Kelsey, P.E., BEAP, Member, kW Engineering, Oakland, CA