Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

This product contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

A previous related session presented the initial ASHRAE Level III Audit and the gap between the results of that assessment and action being taken. This session focuses on a new field test method and diagnostics used to develop an actionable scope of work. To support the scope of work, several Key Performance Indicators (KPI) are used to score the actual installed performance of the systems included. Mr. Lipscomb discusses the development of these KPI, including measurements, calculations, and anticipated changes in performance that will result upon completion of the project. Past ASHRAE fellow Bob Baker contributed guidance for this project.

  • Occidental College Hameetman Science Building HVAC Retrofit and Recommissioning
    Rob Falke, Member
  • Increases to Energy Efficiency, Reliability and Comfort

    Ben Lipscomb, P.E., Associate Member

Run Time: 90 mins