-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Immediate download
- $16.00
- Add to Cart
Customers Who Bought This Also Bought
-
NY-14-C073 -- Energy Efficiency Strategies for Hydronic S...
Priced From $16.00 -
NY-14-C080 -- The Impact of Fin Surface Wettability on th...
Priced From $16.00 -
NY-14-C054 -- Solar Water Heating System with Phase Chang...
Priced From $16.00 -
NY-14-C022 -- Interpersonal Transport of Droplet Nuclei A...
Priced From $16.00
About This Item
Full Description
The retrofitting of a new tunnel ventilation system within an existing structure typically presents constraints around which the design mustbe engineered. This paper presents an example of such a retrofit design in which the ventilation capacity of an existing interstate tunnel issubstantially increased to address present-day life-safety requirements. A number of design alternatives are identified and evaluated leading to theselection of a preferred concept. The paper discusses the constraints encountered, and outlines the measures taken to mitigate them in order tomaximize the performance of the new tunnel ventilation system.