Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This recommended practice describes methods for defining the dc load in a generating station or a substation and for sizing a lead storage battery to supply that load. Some factors relating to cell selection are provided for consideration. Installation, maintenance, qualification, testing procedures, and consideration of battery types other than lead storage are beyond the scope of this recommended practice. Design of the dc system and sizing of the battery charger(s) are also beyond the scope of this recommended practice.

Abstract

Revision Standard - Superseded. Methods for defining the dc load in a generating station or a substation and for sizing a lead storage battery to supply that load are described. Some factors relating to cell selection are provided for consideration. This standard is based on commonly accepted methods used to define the load and to ensure adequate battery capacity and is applicable to all installations and battery sizes. The installations considered are designed for full-float operation with a battery charger serving to maintain the battery in a charged condition as well as to supply the normal dc load.