Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using PD detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.

Purpose

This guide describes diagnostic methods capable of detecting and locating partial discharges from defects and damage in installed shielded power cable systems. The results of PD tests are used to assess the condition of cables and accessories.

Abstract

New IEEE Standard - Inactive-Reserved. This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
 

Document History

  1. IEEE 400.3-2022


    IEEE Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems

    • Most Recent
  2. IEEE 400.3-2006

    👀currently
    viewing


    IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

    • Historical Version