Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This trial-use guide contains instructions for conducting tests to determine the performance characteristics and machine parameters of permanent magnet (PM) machines. The tests described may be applied to motors and generators as needed, and no attempt is made to partition this guide into clauses applying to motors and clauses applying to generators. It is not intended that this guide shall cover all possible tests, or tests of a research nature, but only those general methods that may be used to obtain the performance data and machine parameters. The schedule of factory and field tests, which may be required on new equipment, is normally specified by applicable standards or by contract specifications. This guide should not be interpreted as requiring any specific test in a given transaction or implying any guarantee as to specific performance indices or operating conditions. The term specified conditions for tests as used in this guide will be considered as rated conditions unless otherwise agreed upon. Rated conditions apply usually to the quantities listed on the machine nameplate

Purpose

Instructions for conducting tests to determine the performance characteristics and machine parameters of PM machines are covered in this guide. Additional tests can be required by the customers and operators to satisfy specific performance indices.

Abstract

New IEEE Standard - Inactive-Reserved. Contained in this trial-use guide are instructions for conducting tests to determine the performance characteristics and machine parameters of permanent magnet (PM) machines. The tests described may be applied to motors and generators, as needed, and no attempt is made to partition this guide into clauses applying to motors and clauses applying to generators. It is not intended that this guide shall cover all possible tests, or tests of a research nature, but only those general methods that may be used to obtain the performance data and machine parameters. The schedule of factory and field tests, which may be required on new equipment, is normally specified by applicable standards or by contract specifications. This guide should not be interpreted as requiring any specific test in a given transaction or implying any guarantee as to specific performance indices or operating conditions. The term specified conditions for tests as used in this guide will be considered as rated conditions unless otherwise agreed upon. Rated conditions apply usually to the quantities listed on the machine nameplate.
 

Document History

  1. IEEE 1812-2023


    IEEE Guide for Testing Permanent Magnet Machines

    • Most Recent
  2. IEEE 1812-2014

    👀currently
    viewing


    IEEE Trial-Use Guide for Testing Permanent Magnet Machines

    • Historical Version