-
- Available Formats
- Options
- Availability
- Priced From ( in USD )
-
- Immediate download
- $15.00
- Add to Cart
Customers Who Bought This Also Bought
-
DA-88-06-3 -- Laboratory Efficience Comparisons of Modula...
Priced From $15.00 -
DA-88-17-3 -- Comparative Energy Use of Vacuum, Hydro, an...
Priced From $15.00 -
DA-88-16-2 -- An Evaluation of Computer-Based Models that...
Priced From $15.00 -
DA-88-10-2 -- Residential Hot Water Use in Florida and No...
Priced From $15.00
About This Item
Full Description
An initial feasibility study was performed to assess the attractiveness of using district heating and cooling in Des Moines, Iowa. A promising heat supply option is to recommission a mothballed 210 MW power plant located 4.5 miles (7.5 km) from downtown. The power plant would be retrofitted for cogeneration with capabilities that include meeting the complete 150 MW peak thermal load or producing 40 MW of electricity at a base thermal load. A high temperature hot water system would be used to deliver the thermal energy from the power plant to downtown. The loads in Des Moines are described and the technical and economic aspects of the district heating supply and distribution are discussed.
Units: Dual