Language:
-
- Available Formats
- Availability
- Priced From ( in USD )
-
- Immediate download
- $125.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $125.00
- Add to Cart
Customers Who Bought This Also Bought
-
CTI TP03-06c
Priced From $14.00 -
CTI TP06-18
Priced From $14.00 -
CTI TP62-05
Priced From $14.00 -
CTI TP72-04
Priced From $14.00
About This Item
Full Description
Part I - Test Procedure: methods and instrumentation for testing mechanicaldraft and natural draft cooling towers.
Part II - Evaluation of results:method for evaluation of the performance of mechanical draft cooling towersusing both characteristic curves and performance curves; natural draft andnatural draft-fan assisted cooling towers using characteristic curves andperformance curves. The results are expressed in terms of water coolingcapacity.
Part III - Appendix: example evaluation of mechanical draftcooling tower, natural draft cooling tower, and fan-assist cooling towerusing either characteristic curve method or performance curve method; calculationof KaV/L; enthalpy tables; facsimiles of ATC-106 Test Forms.
Part II - Evaluation of results:method for evaluation of the performance of mechanical draft cooling towersusing both characteristic curves and performance curves; natural draft andnatural draft-fan assisted cooling towers using characteristic curves andperformance curves. The results are expressed in terms of water coolingcapacity.
Part III - Appendix: example evaluation of mechanical draftcooling tower, natural draft cooling tower, and fan-assist cooling towerusing either characteristic curve method or performance curve method; calculationof KaV/L; enthalpy tables; facsimiles of ATC-106 Test Forms.