Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Secure PDF

      Secure PDF Files

      Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.

        What you can do with a Secure PDF:
      • Print
      • Search
      • Highlight
      • Bookmark
      Please note that some publishers - including BOMA, IADC and NRC - do not allow printing of their documents.

    • Immediate download
    • $345.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $345.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $466.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This is the tenth edition of CSA W59, Welded steel construction. It supersedes the previous editions published in 2013, 2003, 1989, 1984, 1982, 1977, 1970, 1946, and 1940.

The following is a brief description of some of the most significant changes to the current edition of CSA W59:

a) Clause 3 has been revised to add several steels to the prequalified list.

b) Clause 5 has been updated to add clarification on the requirements related to hydrogen designators.

c) Clause 7 has been reworked to provide clarity on roles and responsibilities for welding inspection.

d) Clause 8 includes corrections related to terminology, equipment, and flaw length sizing. Calibration requirements have been revised to reflect digital instrumentation. Allowances for the use of an alternative ultrasonic technique and radiographic imaging systems have been added.

e) In Clause 10, all the figures have been reworked into a new format which arranges prequalified joint by joint type rather than by welding process.

f) As this Standard contains no commentary, various non-mandatory annexes have been included to generate a better understanding of certain aspects of welded steel construction. The annexes of the previous edition of this Standard have generally been reviewed for clarity. In addition

i) Annex W has been added to provide additional requirements for welding consumables, welded fabrication techniques, weld repairs, demand critical welds and welding inspection for seismic-force resisting system (SFRS) of structures.

ii) Annex X has been added to define an alternative ultrasonic examination technique for manual conventional and manual phased array ultrasound. New acceptance criteria were developed for equivalent sensitivity to the fixed attenuation (Clause 8.2) technique.
 

Document History

  1. CSA W59-18

    👀currently
    viewing


    Welded Steel Construction

    • Most Recent
  2. CSA W59-13


    Welded Steel Construction (Metal Arc Welding), Includes Update No. 1 (2014), Update No. 3 (2015), Update No. 4 (2015)

    • Historical Version
  3. CSA W59-03 (R2008)


    Welded Steel Construction (Metal Arc Welding), Includes Update No. 1 (2004)

    • Historical Version
  4. CSA W59-1989 (R1998)


    Welded Steel Construction (Metal Arc Welding) (Imperial version)

    • Historical Version
  5. CSA W59-M1989 (R2001)


    Welded Steel Construction (Metal Arc Welding) (Metric version)

    • Historical Version
  6. CSA W59-M1989 Amendment


    Welded Steel Construction (Metal Arc Welding) - General Instruction 2 incorporating General Instruction 1

    • Historical Version