Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

Discusses the effects of the commissioning process on the long-term operations and maintenance of heating, ventilation and air conditioning systems in buildings. Deals with the construction process, testing, balancing and controls, documentation and training. Concludes by noting that ASHRAE GPC-1 has produced a commissioning guideline.

KEYWORDS: Commissioning, maintenance, operations, heating, ventilation, air conditioning.