Language:
-
- Available Formats
- Options
- Availability
- Priced From ( in USD )
-
-
Secure PDF
Secure PDF Files
Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.
-
What you can do with a Secure PDF:
- Print
- Search
- Highlight
- Bookmark
- Immediate download
- $45.00
- Add to Cart
-
Secure PDF
-
- Printed Edition
- Ships in 1-2 business days
- $45.00
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $59.00
- Add to Cart
Customers Who Bought This Also Bought
-
ASME PTC 19.1-2018
Priced From $165.00 -
ASME PTC 6S-1988 (R2019)
Priced From $93.00 -
ASME PTC 23-2003 (R2023)
Priced From $138.00 -
ASME PTC 30.1-2007 (R2020)
Priced From $105.00
About This Item
Full Description
This code provides the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant. It is applicable to all electrical generating facilities, independent of fuel source or prime movers. The load change rate is distinguished by starting from one operating point at steady state condition and transitioning to another. Startup commences at a shutdown condition, or intermediary startup condition, and proceeds to a defined running condition. Shutdown begins at a running condition and proceeds to a shutdown condition or intermediary shutdown condition. Measurements of actual net generation as a function of time are the primary test parameters. Additional data and information will be collected as part of this analysis to determine the long and short term effects of various ramp rates on the equipment and systems in the power plant of interest. This information includes and is not limited to design specifications and actual operating conditions.