Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $585.00
    • Add to Cart
    • Print Edition Plus Online
    • Ships in 1-2 business days
    • $936.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

BPVC-III NCA-2019 provides requirements for the materials, design, fabrication, examination, testing, inspection, installation, certification, stamping, and overpressure protection of nuclear power plant components, and component and piping supports. Components include metal vessels and systems, pumps, valves, and core support structures. The components and supports covered by this Section are intended to be installed in a nuclear power system which serves the purpose of producing and controlling the output of thermal energy from nuclear fuel and those associated systems essential to the functions and overall safety of the nuclear power system. This Section provides requirements for new construction and includes consideration of mechanical and thermal stresses due to cyclic operation. Deterioration which may occur in service as a result of radiation effects, corrosion, erosion, or instability of the material is not covered. Rules pertaining to the use of N, NPT, NA and NV Code symbol stamps are also included.
 

Document History

  1. ASME BPVC.III.NCA-2021


    2021 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Most Recent
  2. ASME BPVC.III.NCA-2019

    👀currently
    viewing


    2019 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  3. ASME BPVC.III.NCA-2017


    2017 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  4. ASME BPVC-III NCA-2015


    2015 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  5. ASME BPVC-III NCA-2013


    2013 ASME Boiler and Pressure Vessel Code (BPVC), Section III: Rules for Construction of Nuclear Facility Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  6. ASME BPVC-III NCA-2010


    2010 ASME Boiler and Pressure Vessel Code (BPVC), Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2, Includes 2011 Addenda Reprint

    • Historical Version
  7. ASME BPVC-III NCA-2007


    2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2, Includes Addenda (2008 and 2009)

    • Historical Version
  8. ASME BPVC-III NCA-2004


    2004 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  9. ASME BPVC-III NCA-2001


    2001 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  10. ASME BPVC-III NCA-1998


    1998 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  11. ASME BPVC-III NCA-1995


    1995 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  12. ASME BPVC-III NCA-1992


    1992 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  13. ASME BPVC-III NCA-1989


    1989 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  14. ASME BPVC-III NCA-1986


    1986 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  15. ASME BPVC-III NCA-1983


    1983 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  16. ASME BPVC-III NCA-1980


    1980 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version
  17. ASME BPVC-III NCA-1977


    1977 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

    • Historical Version