Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $50.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $50.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $65.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Applies to the construction, installation, operation, inspection and maintenance of overhead and gantry stacker cranes with top running or under running bridge, multiple girder. The vertical mast for guiding the carriage is attached to the top running or under running trolley. These cranes are grouped because they all have the same features in vertically guiding the lifted load. Stacker cranes in this grouping include semi-gantry, cantilever gantry, and others having the same fundamental characteristics.

 

Document History

  1. ASME B30.18-2021


    Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

    • Most Recent
  2. ASME B30.18-2016


    Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

    • Historical Version
  3. ASME B30.18-2011


    Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist

    • Historical Version
  4. ASME B30.18-2004 (R2009)

    👀currently
    viewing


    Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist

    • Historical Version
  5. ASME B30.18-1998


    Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

    • Historical Version