Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF

      Secure PDF Files

      Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.

        What you can do with a Secure PDF:
      • Print
      • Search
      • Highlight
      • Bookmark
      Please note that some publishers - including BOMA, IADC and NRC - do not allow printing of their documents.

    • 👥
    • Immediate download
    • $178.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This API document presents guidelines and recommended practices for the design and operation of intermittent, chamber, and plunger gas-lift systems. The document is formatted with Section 1 presenting a summary of the primary guidelines and recommended practices for these methods of artificial lift for use by practicing engineers and field operators. Sections 2 to Sections 7 are designed to provide more detailed information, including theoretical background for many of the guidelines and recommended practices. These sections are available for anyone, but are specifically intended for those who wish to gain a comprehensive understanding of the theory and practice of intermittent gas-lift. This document also contains three annexes. Annex A contains mathematical derivations and models of some of the most pertinent intermittent gas-lift calculations. Annex B contains a comprehensive example of an intermittent gas-lift design. Annex C describes how to use the Field Units Calculator and SI Units Calculator. These are two spreadsheets that are part of this RP.