Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $95.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $128.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

ANS 58.8-2019 establishes criteria and methods for identifying, calculating, validating, tracking, and documenting time requirements for the performance of nuclear power plant time-limited manual actions that are associated with either design-basis events (DBEs) or licensing basis.
 

Document History

  1. ANS 58.8-2019

    👀currently
    viewing


    Time Response Criteria for Manual Actions at Nuclear Power Plants

    • Most Recent
  2. ANS 58.8-1994 (R2017)


    Time Response Design Criteria for Safety Related Operator Actions

    • Historical Version