Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF

      Secure PDF Files

      Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.

        What you can do with a Secure PDF:
      • Print
      • Search
      • Highlight
      • Bookmark
      Please note that some publishers - including BOMA, IADC and ICML - do not allow printing of their documents.

    • 👥
    • Immediate download
    • $64.50
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $64.50
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $103.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This report examines the benefits of the design of concrete towers for land-based wind turbines with heights in excess of 325 ft (100 m), in comparison to those of round steel tubular towers. These benefits include reduced cost, increased stiffness, and superior service life performance. Construction alternatives, design criteria, design methodologies, and guidance for preliminary design of concrete towers are presented.

The report recognizes that final tower design requires close coordination with the turbine supplier. The report is intended for those involved in developing preliminary tower designs. Concrete towers designed for maximum wind forces can be satisfactory for preliminary design, but the final design requires checking for all loads, especially fatigue and dynamic effects from wind and turbine operations. Design of connections and their proportions require an understanding of fatigue requirements during preliminary design for the connection design to remain valid during final checks.