Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF

      Secure PDF Files

      Secure PDF files include digital rights management (DRM) software. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing. In order to read a Secure PDF, you will need to install the FileOpen Plug-In on your computer. The FileOpen Plug-In works with Adobe Reader and other viewers. Visit FileOpen to see the full list.

        What you can do with a Secure PDF:
      • Print
      • Search
      • Highlight
      • Bookmark
      Please note that some publishers - including BOMA, IADC and NRC - do not allow printing of their documents.

    • 👥
    • Immediate download
    • $36.50
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $36.50
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $58.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Fast-track concrete paving helps contractors improve profits with time-of-completion incentives. It also helps public agencies combat increasing public impatience with traffic interruptions during pavement repair or replacement. But successful use of this powerful technology requires agencies and contractors to change traditional construction specifications and processes. Accelerated Techniques for Concrete Paving describes the needed changes and also applications for roadways, airfields, and other pavements. You'll get recommendations for planning, concrete materials and properties, jointing and joint sealing, curing and temperature control, concrete strength testing, and opening the pavement to traffic. An appendix gives flexural strength requirements for opening to traffic. These requirements vary with pavement class (municipal or highway), foundation support value, and expected loading, expressed as equivalent single-axle loads.

With the new accelerated techniques, concrete pavements can be opened to traffic in 12 to 48 hours, while traditional techniques require waits of 5 to 14 days. This fast-track approach allows transportation officials to complete projects that under normal time frames would simply not be feasible.
 

Document History

  1. ACI 325.11R-19


    Report on Accelerated Techniques for Concrete Paving

    • Most Recent
  2. ACI 325.11R-01

    👀currently
    viewing


    Accelerated Techniques for Concrete Paving

    • Historical Version