Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

A short description of the upgrading of the heating and cooling systems for the 1.5 million ft2 (139 350 m2) headquarters complex of Milacron Inc., a machine tool manufacturer in Cincinnati. Innovative techniques used in the project include 1) co-firing waste with coal to reduce costs for steam production and waste disposal, 2) consolidating chilled water production to reduce operation and maintenance costs, 3) reducing the use of CFC refrigerants, use of some second-hand equipment to save on capital costs and time.