-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
-
$188.00Members pay $131.60
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
-
$188.00Members pay $131.60
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
-
$320.00Members pay $224.00
- Add to Cart
Customers Who Bought This Also Bought
-
API RP 19D
Priced From $132.00 -
API Spec 20E
Priced From $102.00 -
API Std 20L
Priced From $71.00 -
API Spec 20F
Priced From $94.00
About This Item
Full Description
These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.
Document History
-
API RP 19GLHB
Gas Lift Handbook, First Edition, Includes Addendum 1 (2023)- Most Recent
-
API RP 19G5
viewing
Operation, Maintenance, Surveillance, and Troubleshooting of Gas-lift Installations, First Edition- Historical Version
-
API RP 19G11
Dynamic Simulation of Gas-lift Wells and Systems, First Edition- Historical Version
-
API RP 19G10
Design and Operation of Intermittent Gas-lift Systems, First Edition- Historical Version
-
API RP 19G9
Design, Operation, and Troubleshooting of Dual Gas-lift Wells, Second Edition- Historical Version
-
API RP 19G9
Design, Operation, and Troubleshooting of Dual Gas-lift Wells, First Edition- Historical Version
-
API RP 11V5 (R2015)
Operation, Maintenance, Surveillance, and Troubleshooting of Gas-lift Installations, Third Edition- Historical Version
-
API RP 11V8 (R2015)
Recommended Practice for Gas Lift System Design and Performance Prediction, First Edition- Historical Version
-
API RP 11V6 (R2015)
Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves, Second Edition- Historical Version
-
API RP 11V5
Operation, Maintenance, and Trouble-Shooting of Gas Lift Installations- Historical Version