-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
-
$110.00Members pay $77.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
-
$110.00Members pay $77.00
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
-
$186.00Members pay $130.20
- Add to Cart
Customers Who Bought This Also Bought
-
API Std 19C
Priced From $127.00 -
API RP 52 (R2010)
Priced From $128.00 -
API Std 65-Part 2 (R2016)
Priced From $145.00 -
API RP 92S
Priced From $141.00
About This Item
Full Description
This document considers situations where the total drilling operation is performed balanced or overbalanced, including both hydrostatically overbalanced (no supplemental surface pressure needed to control inflow) and hydrostatically underbalanced (supplemental surface pressure needed to control inflow) systems.
This document does not cover MPD operations with subsea BOP stacks.
Amendments, rulings, supplements, and errata
-
API RP 92M Errata 2
Download
Errata 2 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition -
API RP 92M Addendum 1
Download
Addendum 1 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition -
API RP 92M Errata 1
Download
Errata 1 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition, Includes Errata (2017)