-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
-
$140.00Members pay $98.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
-
$140.00Members pay $98.00
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
-
$237.00Members pay $165.90
- Add to Cart
Customers Who Bought This Also Bought
-
API 2031
Priced From $144.00 -
API TR 6AM
Priced From $140.00 -
API RP 2210 (R2020)
Priced From $73.00 -
API RP 14C
Priced From $256.00
About This Item
Full Description
- Mooring Analysis
- Mooring Design Criteria
- Consequences of Failure
- Indicative GOM hurricane extreme metocean conditions
- Site-specific risk assessment and mitigation
- Mooring hardware issues such as anchor system considerations and mooring system improvements
- Mooring operation issues such as deployment, hurricane preparedness, and inspection
This RP was developed through a cooperative arrangement with the American Petroleum Institute's Subcommittee on Offshore Structures - RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled "US Gulf of Mexico Mooring Strength Reliability" (MODU JIP).
Document History
-
API RP 2SK
Design and Analysis of Stationkeeping Systems for Floating Offshore Structures, Fourth Edition- Most Recent
-
API RP 95F
viewing
Gulf of Mexico MODU Practices for the 2007 Hurricane Season - Interim Recommendations (WITHDRAWN - REPLACED BY APPENDIX K TO API 2SK)- Historical Version
-
API RP 95F
Interim Guidance for Gulf of Mexico MODU Mooring Practice-2006 Hurricane Season, First Edition- Historical Version
-
API RP 2SK (R2015)
Design and Analysis of Stationkeeping Systems for Floating Structures, Third Edition, Includes Addendum (2008)- Historical Version
-
API RP 2SK
Recommended Practice for Design and Analysis of Stationkeeping Systems for Floating Structures- Historical Version