Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Construction documentation and contract administration for tendered projects need to be clear and concise to ensure the design intent of a ground coupled heat pump (GCHP) system is met. This is also true of design/build GCHP projects, but there is more leeway to work with clients and contractors to meet the design intent as cost-effectively as possible. This seminar considers the documentation and contract administration requirements of a tendered project and how that can differ from a design/build project.

  1. Construction Docs for Closed-Loop Ground Heat Exchangers: System Installation, Meet Design Intent
    Ryan Carda, P.E., Geoconnections Inc, Elkton, SD
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)
  2. Closed Loop Ground Heat Exchanger (GHX) Contract Administration
    Terry Proffer, Major Geothermal, Wheatridge, CO
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)
  3. Design-Bid Documentation Requirements for Specifications and Drawings of GCHP Systems
    Warren (Trey) Austin III, P.E., Member, Geo-Energy Services, Littleton, CO
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)