-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
- $395.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $395.00
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $514.00
- Add to Cart
Customers Who Bought This Also Bought
-
PEI STTM Level 2-19
Priced From $395.00 -
PEI RP100-22
Priced From $395.00 -
PEI RP1600-21
Priced From $395.00 -
PEI RP1400-21
Priced From $395.00
About This Item
Full Description
The recommended practices described in this document are limited to the installation, operation, inspection, maintenance and testing of overfill-prevention equipment used on shop-fabricated, stationary, and atmospheric aboveground tanks intended for the storage or supply of liquid petroleum products and alternative fuels. These recommended practices may be applied to tanks used for bulk storage, motor fuels dispensing, emergency generator systems, residential and commercial heating oil supply systems, or used oil storage systems.
The transfer of large quantities of fuel into aboveground storage tanks usually involves a variety of pumps, pipes, valves and controls. The configuration of this equipment very often is unique to each storage-tank facility. Typically, the only person on site to manage the fuel transfer operation is the tank vehicle driver. The lack of industry standards for fuel tranfer procedures and equipment, and the reliance on a minimum number of personnel to execute the fuel transfer, pose significant challenges to reducing the occurence of overfill incidents.
Document History
-
PEI RP600-18
Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks (2018 Edition)- Most Recent
-
PEI RP600-12
viewing
Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks (2012 Edition)- Historical Version
-
PEI RP600-07
Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks- Historical Version