About This Item

 

Full Description

This consolidated PDF version of the N293-07 standard incorporates the update #1 dated January 2008 into the standard. This PDF also includes supplement #1. Preface

This is the third edition of CSA N293, Fire protection for CANDU nuclear power plants. It supersedes the previous editions published in 1995 and 1987.

This edition of CSA N293 includes changes arising from new knowledge, operating experience, and comments from users of the Standard. These changes include clarification of the Standard's scope and significant reorganization of its content. CSA N293 has also been revised to be a more objective-based Standard, to be consistent with the 2005 editions of the National Building Code of Canada (NBCC) and National Fire Code of Canada (NFCC).

1 Scope

1.1
This Standard provides the minimum fire protection requirements for the design, construction, commissioning, operation, and decommissioning of CANDU® nuclear power plants, including structures, systems, and components (SSCs) that directly support the plant and the protected area. Note: CANDU (CANada Deuterium Uranium) is a registered trademark of Atomic Energy of Canada Limited (AECL).

1.2
External events such as an aircraft crash, explosion external to the protected area, or terrorist attack are outside the scope of this Standard.

1.3
In CSA Standards, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; "may" is used to express an option or that which is permissible within the limits of the standard; and "can" is used to express possibility or capability. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

1.4
The values given in SI (metric) units are the standard. The values given in parentheses are for information only.
 

Document History

  1. CSA N293:23


    Fire protection for nuclear power plants, Includes Errata (2023)

    • Most Recent
  2. CSA N293-12 (R2022)


    Fire protection for nuclear power plants, Includes Update No. 1 (2017)

    • Historical Version
  3. CSA N293-07

    👀 currently
    viewing


    Fire protection for CANDU nuclear power plants, Includes Update No. 2 (2009)

    • Historical Version
  4. CAN/CSA N293-95 (R2001)


    Fire Protection for CANDU Nuclear Power Plants

    • Historical Version