Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $350.52
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $350.52
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $473.71
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Recommendations for a method for keeping protected escape routes in buildings clear of smoke by pressurizing the escape routes. The method is an alternative to the natural ventilation required by CP 3:Ch IV and certain building acts and regulations.

All current amendments available at time of purchase are included with the purchase of this document.
 

Document History

  1. BS EN 12101-6:2022


    Smoke and heat control systems-Specification for pressure differential systems. Kits

    • Most Recent
  2. BS EN 12101-6:2005


    Smoke and heat control systems-Specification for pressure differential systems. Kits

    • Historical Version
  3. BS 5588-4:1998


    Fire precautions in the design, construction and use of buildings-Code of practice for smoke control using pressure differentials

    • Historical Version
  4. BS 5588-4:1978

    👀 currently
    viewing


    Fire precautions in the design, construction and use of buildings-Code of practice for smoke control in protected escape routes using pressurization

    • Historical Version