Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $24.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $24.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

After nearly two years, the City of DeKalb's Water Division continues to recognize significant electrical cost savings as the result of a 10-year program of plans and implementation of a modernized water system with significant increased distribution storage, new wells, additional mains, and a fully computerized control system. Aside from significant electrical cost savings, the City believes that other ancillary benefits are occurring as the result of the off-peak pumping and increased distribution storage. Those benefits include: reduction in pump repairs; reduction in electrical control repairs; fewer main breaks; less manpower staffing for off hour duties; a reduction of weekend and night personnel; few call backs; and improved and stabilized pressure throughout the system.