Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $610.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $1,037.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This nuclear standard states requirements for a Level 1 Probabilistic Risk Assessment (PRA) of internal and external hazards while at-power for the evaluation of core damage frequency (CDF). In addition, this standard states requirements for a limited Level 2 PRA sufficient to evaluate large early release frequency (LERF). The only hazards explicitly excluded from the scope are accidents resulting from purposeful human-induced security threats (e.g., sabotage, terrorism). These requirements are written for operating light water reactor (LWR) nuclear power plants. This standard may be used for LWR plants under design or construction or for advanced LWRs, such as small modular reactors (SMR), but revised or additional requirements may be needed.

 

Document History

  1. ASME ANS RA-S-1.1-2024

    👀 currently
    viewing


    Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications

    • Most Recent
  2. ASME ANS RA-S-1.1-2022


    Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications

    • Historical Version
  3. ASME RA-S-2008 (R2019)


    Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, Includes Addenda RA-Sa-2009, Errata (2009), and Addenda RA-Sb-2013

    • Historical Version
  4. ASME RA-S-2002


    Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, Includes 2003, 2005, and 2007 Addenda

    • Historical Version