Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

Collège Jean-de-Brébeuf in Montreal was in desperate need of a retrofit. The heating plant’s aged equipment was unable to meet the school’s heating demand effectively. Some equipment was unreliable and inefficient. In addition, rapidly rising fuel prices were increasing the cost of operating the plant. The school’s administrative director needed a solution to increase the plant’s energy efficiency to reduce its annual operating cost and minimize the impact of the rapidly increasing fuel cost.