Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This recommended practice provides a guide to installation, splicing, termination, and field-proof testing of cable systems for the petrochemical industry. It is not intended to be a design document, although many of the problems of installation can be avoided by designing cable layouts with the installation limits of this recommended practice.

Purpose

The purpose of this recommended practice is to provide a uniform guide of installation limits that will avoid premature cable failure due to improper installation and mechanical damage during installation. It is intended to provide a reference that can be specified for cable installations.

Abstract

New IEEE Standard - Superseded. Superseded by 576-2000. A guide to installation, splicing, termination, and field-proof testing of cable systems is provided. The aim is to avoid premature cable failure due to improper installation and mechanical damage during installation, and to provide a reference that can be specified for cable installations. This standard is not intended to be a design document; many of the problems of installation can be avoided by designing cable layouts with the installation limits of this recommended practice.
 

Document History

  1. IEEE 576-2000


    IEEE Recommended Practice for Installation, Termination, and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications

    • Most Recent
  2. IEEE 576-1989

    👀currently
    viewing


    IEEE Recommended Practice Installation, Termination, and Testing of Insulated Power Cable as Used in the Petroleum and Chemical Industry

    • Historical Version