Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $184.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $184.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $313.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This document provides recommended practices (RPs) for the selection, design, operation, surveillance, optimization, automation, and troubleshooting of dual gas-lift wells.

The purpose of this document is to present RPs, guidelines, and tools to help obtain optimum production from dual gas-lift wells. This document also contains practices that should be avoided to minimize problems and inefficiencies that can be associated with ineffective dual gas-lift operations. Compared to single completions, dual completions typically have more operating problems, are more difficult to work over, and can produce less efficiently.

It is not the purpose of this document to recommend the practice of dual gas-lift. In some cases, dual gas-lift is problematic and often ineffective. Often it is difficult or even impossible to effectively produce both completions in a dual well using gas-lift over the long term. Where there are other feasible alternatives to produce dual wells, they should be considered. However, many dually completed oil wells should be artificially lifted initially or after reservoir pressures have declined and/or water cuts have increased. In many cases, the only practical method of artificial lift for these wells is gas-lift. Therefore, every effort should be made to design and operate dual gas-lift systems as effectively as possible.

Annexes to this RP include:

a) an overview of dual gas-lift systems,
b) dual gas-lift mandrel spacing designs,
c) dual gas-lift unloading valve design for production pressure operated (PPO) valves, and
d) dual gas-lift practices not recommended.
 

Document History

  1. API RP 19GLHB


    Gas Lift Handbook, First Edition, Includes Addendum 1 (2023)

    • Most Recent
  2. API RP 19G5


    Operation, Maintenance, Surveillance, and Troubleshooting of Gas-lift Installations, First Edition

    • Historical Version
  3. API RP 19G11


    Dynamic Simulation of Gas-lift Wells and Systems, First Edition

    • Historical Version
  4. API RP 19G10


    Design and Operation of Intermittent Gas-lift Systems, First Edition

    • Historical Version
  5. API RP 19G9

    👀 currently
    viewing


    Design, Operation, and Troubleshooting of Dual Gas-lift Wells, Second Edition

    • Historical Version
  6. API RP 19G9


    Design, Operation, and Troubleshooting of Dual Gas-lift Wells, First Edition

    • Historical Version
  7. API RP 11V5 (R2015)


    Operation, Maintenance, Surveillance, and Troubleshooting of Gas-lift Installations, Third Edition

    • Historical Version
  8. API RP 11V8 (R2015)


    Recommended Practice for Gas Lift System Design and Performance Prediction, First Edition

    • Historical Version
  9. API RP 11V6 (R2015)


    Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves, Second Edition

    • Historical Version
  10. API RP 11V5


    Operation, Maintenance, and Trouble-Shooting of Gas Lift Installations

    • Historical Version