Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $62.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $84.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

1.1 This test method covers procedures for evaluating the durability of rock for erosion control when exposed to wetting and drying conditions on slabs of rock. This weathering test exposes the rock to wetting and drying cycles similar to fluctuating water levels and weather conditions. The rock slabs, prepared in accordance with procedures in Practice D5121, are intended to be representative of erosion control rock and its weaknesses. The test is appropriate for breakwater stone, armor stone, riprap and gabion sized rock materials.

The limitations of the test are twofold. First, the size of the cut rock slab specimens may eliminate some of the internal defects present in the rock structure. The test specimens may not be representative of the quality of the larger rock samples used in construction. Careful examination of the rock source and proper sampling are essential in minimizing this limitation. Secondly, the test requires the rock slabs to be exposed to 80 wetting-drying cycles. The test is time intensive and will require approximately three months to complete the sample preparation, testing, and analysis portions of the procedure.

1.2 The use of reclaimed concrete and other materials is beyond the scope of this test method.

1.3 Units-The values stated in either SI units or inch-pound units [presented in brackets] are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.

1.4 All observed and calculated values shall conform to the guidelines for significant digits and rounding established in Practice D6026, unless superseded by this standard.

1.4.1 For purposes of comparing measured or calculated value(s) with specified limits, the measured or calculated value(s) shall be rounded to the nearest decimal or significant digits in the specified limits.

1.4.2 The procedures used to specify how data are collected/recorded or calculated in this standard are regarded as the industry standard. In addition, they are representative of the significant digits that generally should be retained. The procedures used do not consider material variation, purpose for obtaining the data, special purpose studies, or any considerations for the user's objectives; and it is common practice to increase or reduce significant digits of reported data to be commensurate with these considerations. It is beyond the scope of this standard to consider significant digits used in analytical methods for engineering design.

1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

 

Document History

  1. ASTM D5313/D5313M-21


    Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

    • Most Recent
  2. ASTM D5313/D5313M-12(2013)

    👀currently
    viewing


    Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

    • Historical Version
  3. ASTM D5313/D5313M-12


    Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

    • Historical Version
  4. ASTM D5313-04


    Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

    • Historical Version
  5. ASTM D5313-92(1997)


    Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

    • Historical Version